Major Contracting Services

Safe Cutting of Trees

Trees should not be cut if they will fall and damage overhead lines. If the tree is on the customer premises or private property it is the customer’s responsibility to cut and maintain the tree to avoid contact with overhead lines. However if the customer wishes the line to be disconnected before cutting the tree a request should be made to the relevant area office. A nominal fee of $194 is applicable when a service connection to the house has to be disconnected.

Charges are subject to a 12.5% Value Added Tax (VAT)

Isolation of Supplies

This is required when the customer needs to perform maintenance or inspection work on their internal installation. The Utilization section in the Area Office should be contacted.

Temporary Supplies

This is typically provided for a construction site where a temporary supply is required.

Line Construction

If customers would like to have lines constructed for private purposes (e.g. construction and installation purposes), T&TEC can also facilitate the customer with feasibility studies, design and construction.

Decorative And Festival Lighting

The Commission can utilize its bucket trucks to install decorative lighting. The charge will depend on the size and complexity of the job. Contact the Utilization section in the Area office.

Services And Revised Rates
MAJOR CONTRACTING SERVICE
REVISED RATE FROM
JANUARY 13TH, 2023 VAT INCLUSIVE
HV Isolation during normal working hours
$4,689.36
HV Isolation during weekends and public holidays
$16,300.44
Direct single phase temporary supply
$3,024.70
Direct three phase temporary supply
$5,718.41
T&TEC's supervision of installation / removal of pennants / banners. (Cost for every three pennants or part thereof.)
$1,368.07

Installation / removal of pennants by T&TEC's resources only. (Cost for every three pennants or part thereof.)

$3,721.77

Installation / removal of banners by in-house resources only.

$3,721.77
The first banner will cost $3,721.77. For each additional banner thereafter which can transparently viewed as located within an approximate 10km radius of each other i.e. in close proximity to each other, will be $3,066.57.
Temporary Supply (URD) "Stick In Meter"
$2,131.44